Motus guides patients through their prescribed exercises with a 3D coach, scores every rep through the phone's camera, and sends real range-of-motion numbers back to their clinician. No sensors, no wearables — and video never leaves the phone.
Runs in the browser on any phone, tablet or laptop with a camera.
A clinician sets where the patient starts and where they should get to. Motus divides the distance into weekly targets and walks the patient there, one measured rep at a time — and everything measured flows straight back.
Pick clinical functions — knee flexion, cervical rotation, finger extension — from a visual library with previews of every movement. Set a target and a number of weeks; Motus writes the week-by-week ramp onto every exercise, per side where it matters.

In clinic, the patient moves to their comfortable limit and holds for three seconds — best of three attempts becomes the baseline. It anchors the whole ramp, so the starting point is measured, not estimated from memory.

Every exercise opens with a 3D demonstration while the instructions are spoken. Then the camera takes over: each rep only counts when the joint truly reached its band and held — with live spoken coaching, so nobody squints at a screen mid-exercise.

Range-of-motion trends against goal lines, pain before and after every session, adherence with honest gaps, red-flag events — all in the clinician's portal the moment the session ends. The app reports; the clinician decides.

Every exercise is scored as a confirmed movement cycle between clinically tuned bands — a rep only counts when the joint really got there and held. These are the actual in-app coaches, running live on this page.
An inverted setup scores zero reps rather than a plausible wrong number. Unusable targets are rejected, not fudged.
An elbow exercise never asks for your knees. Framing, silhouettes and guidance are scoped to the joint being measured.
Body pose for limbs, a 21-point hand model for fingers and wrists, face geometry for the neck — each movement uses the vision model that measures it best.
Every exercise opens with a full-screen 3D demonstration while the instructions are spoken aloud. Mid-exercise, one tap brings the coach back — side by side with the exact guide on screen. The phone below is running the real thing.
Clinicians prescribe in the language they already use — functions with a baseline, a target and a number of weeks. Motus turns that into per-week scoring bands for every exercise, per side where it matters.

Ten body regions, from post-TKR knee work to per-finger tendon glides. Each entry shows its setup, whether it takes a weekly target, and a one-tap preview of the movement itself.

Doctor and physiotherapist share the same full portal — functions, camera baselining, libraries, progress. Whoever sees the patient first can start the program.
Add the other clinician to a prescription's header and it appears in their portal too. Private prescriptions stay private.
Doctor and physio notes append to a single timestamped record — every entry carries its author's name and role, visible to both.
All movement tracking runs on the patient's own device. Only derived numbers — joint angles, rep counts, pain ratings — are ever stored or shared. Raw video has nowhere to go: there is no upload path in the product.